Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Boulder-Chino Transmission Line (2nd) - Hanging dead-end insulator strings at Tower M31-T4.
photCL SCE 02 - 23246

Visual Materials
Boulder-Chino Transmission Line (2nd) - Transposition at M107-T2 showing extension straps in Dead End Strings.
photCL SCE 02 - 23269

Visual Materials
Boulder-Chino Transmission Line (2nd) - Tensioning Conductor at M91-T2.
photCL SCE 02 - 23267

Visual Materials
Boulder-Chino Transmission Line (2nd) - Tensioning conductor at M199-T1.
photCL SCE 02 - 23543

Visual Materials
Boulder-Chino Transmission Line (2nd) - "Clipping-in" conductor at Tower M28-T4.
photCL SCE 02 - 23245

Visual Materials
Boulder-Chino Transmission Line (2nd) - Pulling out conductor with winch tractor at M201-T3.
photCL SCE 02 - 23544