Skip to content

Visual Materials

Powerhouse 2A



You might also be interested in

  • Powerhouse 2a

    Powerhouse 2a

    Visual Materials

    Powerhouse 2a - Looking downstream at Powerhouse #2, showing the structural steel work of PH #2A.

    photCL SCE 02 - 14734

  • Powerhouse 2a

    Powerhouse 2a

    Visual Materials

    Powerhouse 2a. - Looking across Big Creek at upper end of PH #2 and the lower end of PH #2A. Note the concrete abutment in the lower central part of the picture which is for the railroad bridge to be built across the Big Creek channel into Powerhouse #2A.

    photCL SCE 02 - 14737

  • Big Creek Powerhouse 2a

    Big Creek Powerhouse 2a

    Visual Materials

    Big Creek Powerhouse 2a - Showing foundation and tructural steel going up for PH #2A. The excavation for the Penstock is showing to good advantage in this photo also the road behind Powerhouses #2 and #2A.

    photCL SCE 02 - 14730

  • Big Creek - Powerhouse #2, & 2a - maintenance

    Big Creek - Powerhouse #2, & 2a - maintenance

    Visual Materials

    Big Creek - Powerhouse #2, & 2a - maintenance [Exterior shots of PH #2, full shot of PH 2 & 2A, generator floor in PH 2, Unit 6 bucket failure (PH2) with close-ups of damage, damage to overhead crane from flying #10 bucket, PH 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gatehouse, penstock "Y"s, rotor installation, PH2 Unit 3 winding failure, broken buckets]

    photCL SCE 13 - vol 044

  • Big Creek Powerhouse 2a

    Big Creek Powerhouse 2a

    Visual Materials

    Big Creek Powerhouse 2a - Transformer house and 220kV oil switch and rack.

    photCL SCE 02 - 23622

  • Powerhouse 2A

    Powerhouse 2A

    Visual Materials

    Powerhouse 2A - Looking down at Powerhouse 2 & 2A.

    photCL SCE 02 - 14833