Big Creek, Florence Lake Dam - Day's Work Joint Repair April 1940
You might also be interested in

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Day's Work Joint Repair April 1940. No. 3 of cycle of 7: Joint completely chipped and ready for Dock Coating caulking compound along the joint.
photCL SCE 02 - 22881

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Day's Work Joint Repair April 1940. No. 4 of cycle of 7: Applying a caulking bead of dock coating compound with an Alemite gun directly to exposed joint at bottom of key.
photCL SCE 02 - 22882

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Day's Work Joint Repair April 1940. No. 6 of cycle of 7: Guniting seam.
photCL SCE 02 - 22884

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Day's Work Joint Repair April 1940. No. 7 of cycle of 7: Final view of seam after guniting.
photCL SCE 02 - 22885

Big Creek, Florence Lake Dam - walkway repair
Visual Materials
Big Creek, Florence Lake Dam - Walkway repair, guniting set-up
photCL SCE 02 - 23126

Big Creek, Florence Lake Dam - Close-up
Visual Materials
Big Creek, Florence Lake Dam - Close-up of a portion of open seam on Arch 9 at elevation 7296 and 13' west of center line showing exposed loop of 3/8" reinforcing steel lying in day's work joint. Joint was dug out to approximately 1" in width with a short piece of wire.
photCL SCE 02 - 22168