Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Big Creek #2 &2A



You might also be interested in

  • Big Creek #2 &2A

    Big Creek #2 &2A

    Visual Materials

    Big Creek #2 &2A - Another view of water rheostat in operation.

    photCL SCE 02 - 23480

  • Big Creek #2 &2A

    Big Creek #2 &2A

    Visual Materials

    Big Creek #2 &2A - Water rheostat used in testing Unit #3.

    photCL SCE 02 - 23481

  • Big Creek #2 &2A

    Big Creek #2 &2A

    Visual Materials

    Big Creek #2 &2A - View of water rheostat with only partial load on it.

    photCL SCE 02 - 23478

  • Big Creek - Powerhouse #2, & 2a - maintenance

    Big Creek - Powerhouse #2, & 2a - maintenance

    Visual Materials

    Big Creek - Powerhouse #2, & 2a - maintenance [Exterior shots of PH #2, full shot of PH 2 & 2A, generator floor in PH 2, Unit 6 bucket failure (PH2) with close-ups of damage, damage to overhead crane from flying #10 bucket, PH 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gatehouse, penstock "Y"s, rotor installation, PH2 Unit 3 winding failure, broken buckets]

    photCL SCE 13 - vol 044

  • Big Creek #2 &2A

    Big Creek #2 &2A

    Visual Materials

    Big Creek #2 &2A - Removing tank from water after completion of test.

    photCL SCE 02 - 23477

  • Image not available

    Big Creek Powerhouse No. 2 and 2A, Maintenance

    Visual Materials

    Exterior shots of Powerhouse No. 2, full shot of Powerhouse 2 and 2A, generator floor in Powerhouse 2, Unit 6 bucket failure (Powerhouse 2) with close-ups of damage, damage to overhead crane from flying No. 10 bucket, Powerhouse 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gate house, penstock "Y"s, rotor installation, Powerhouse 2.

    photCL SCE