Visual Materials
Core drilling machine setup
You might also be interested in

Core drilling machine setup
Visual Materials
Core machine setup on hole D-13 Dam #1.
photCL SCE 02 - 20153

Core drilling machine setup
Visual Materials
Core drilling machine setup on D-1 Dam 1. Taken from above and left of machine.
photCL SCE 02 - 20154

Machine set up for drilling core hole
Visual Materials
Machine set up for drilling core hole d-1 downstream face Dam 1, station 9+78.5, elevation 6812.4.
photCL SCE 02 - 20150

Core drilling setup on D7 and D8
Visual Materials
Core drilling setup on D7 and D8 - Dam 1.
photCL SCE 02 - 20149

Core drill hole
Visual Materials
Core drill hole U-13 Upstream face Dam 1 approx. 108 to West of West end of gunnited seam.
photCL SCE 02 - 20108

Upstream core drill hole Dam 1
Visual Materials
Upstream core drill hole Dam 1 - U-1 Station 10+98.0 Elev. 6897.5.
photCL SCE 02 - 20104