Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Core drill hole upstream face Dam 1. U-15. Most easterly hole drilled and highest in elevation of any of the 16 holes drilled in the upstream face. Station 3+60.9 Elev. 6630.5.
photCL SCE 02 - 20105

Visual Materials
Upstream core drill hole Dam 1. U-s station 10+62.7. Elevation 6898.9. This hole is in column of concrete near gate house which shows evidence of different mix than surrounding concrete on upstream face.
photCL SCE 02 - 20101

Visual Materials
Upstream face Dam 1, showing condition of concrete in vicinity of core-drill hole U-2 prior to drilling.
photCL SCE 02 - 20103

Visual Materials
Upstream core drill hole Dam #1. U-2 station 11;30.4, Elev. 6898.9.
photCL SCE 02 - 20110

Visual Materials
Upstream core drill hole Dam #1. U-4 station 10;10.5, Elev. 6898.1.
photCL SCE 02 - 20111

Visual Materials
Upstream core drill hole Dam 1 - U-1 Station 10+98.0 Elev. 6897.5.
photCL SCE 02 - 20104