Visual Materials
Core drilling setup on D7 and D8
You might also be interested in

Core drilling machine setup
Visual Materials
Core drilling machine setup on D-1 Dam 1. Taken from above and left of machine.
photCL SCE 02 - 20154

Core drilling machine setup
Visual Materials
Core machine setup on hole D-13 Dam #1.
photCL SCE 02 - 20153

Machine set up for drilling core hole
Visual Materials
Machine set up for drilling core hole d-1 downstream face Dam 1, station 9+78.5, elevation 6812.4.
photCL SCE 02 - 20150

Showing upstream core drill hole 2-1, Dam 2, and drilling scaffold on hole 2-2
Visual Materials
Showing upstream core drill hole 2-1, Dam 2, and drilling scaffold on hole 2-2.
photCL SCE 02 - 20148

Upstream face Dam 1, showing condition of concrete in vicinity of core-drill hole U-2 prior to drilling
Visual Materials
Upstream face Dam 1, showing condition of concrete in vicinity of core-drill hole U-2 prior to drilling.
photCL SCE 02 - 20103
