Visual Materials
Dam 1
- Description
- Dam 1. Photo #3. Showing cribbing cut through while excavating for foundation under uppper end west 42" sluice pipe extension.
- Date
- 6/1/1937
- Call number
- photCL SCE 02 - 20133
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Dam 1. Photo #4. Close-up view of double row of cribbing cut through while excavating for foundation under west 42" sluice pipe extension.
photCL SCE 02 - 20132

Visual Materials
Dam 1. Photo #2 Cutting away cribbing found in excavating for foundation under West 42" sluice pipe. At upper end adjacent to existing concrete.
photCL SCE 02 - 20130

Visual Materials
Dam 1. Photo #1 showing cribbing discovered during excavation for West 42" pipe at upper end adjacent to existing concrete.
photCL SCE 02 - 20129

Visual Materials
Dam 1. View showing preliminary excavation with bull dozer at upper end of sluice pipe extension.
photCL SCE 02 - 20135

Visual Materials
Dam 1, View #2 showing excavation at upper end of center 42" pipe extension.
photCL SCE 02 - 20127

Visual Materials
Big Creek, Huntington Lake Dams - Dam 1 - Excavating for cut-off wall outlet end of 42" sluice valve ext..
photCL SCE 02 - 25259