Dam 1. Photo #1 showing cribbing discovered during excavation for West 42" pipe at upper end adjacent to existing concrete.
photCL SCE 02 - 20129

Visual Materials
Dam 1. Photo #4. Close-up view of double row of cribbing cut through while excavating for foundation under west 42" sluice pipe extension.
photCL SCE 02 - 20132

Visual Materials
Dam 1. Excavation for east pipe at upper end adjacent to existing concrete block below former location of valves. Hole was filled with concrete before forming 12" bearing walls under pipe extension.
photCL SCE 02 - 20131

Visual Materials
View of excavation for 42" sluice pipe upper end after concrete foundation was poured up to base of 12" bearing wall.
photCL SCE 02 - 20145

Visual Materials
Big Creek, Huntington Lake Dams - Dam 1 - Pouring wye section of 42" sluice pipe concrete envelope.
photCL SCE 02 - 25254

Visual Materials
Big Creek, Huntington Lake Dams - Dam 1 - Initial backfill around concrete envelope 42" sluice pipe ext..
photCL SCE 02 - 25260