Visual Materials
Dam 1. Excavation for east pipe at upper end adjacent to existing concrete block below former location of valves. Hole was filled with concrete before forming 12" bearing walls under pipe extension.
photCL SCE 02 - 20131

Visual Materials
Dam 1. Photo #1 showing cribbing discovered during excavation for West 42" pipe at upper end adjacent to existing concrete.
photCL SCE 02 - 20129

Visual Materials
Dam 1. Photo #2 Cutting away cribbing found in excavating for foundation under West 42" sluice pipe. At upper end adjacent to existing concrete.
photCL SCE 02 - 20130

Visual Materials
Dam 1, View #2 showing excavation at upper end of center 42" pipe extension.
photCL SCE 02 - 20127

Visual Materials
View of excavation for 42" sluice pipe upper end after concrete foundation was poured up to base of 12" bearing wall.
photCL SCE 02 - 20145

Visual Materials
Big Creek, Huntington Lake Dams - Dam 1 - Pouring wye section of 42" sluice pipe concrete envelope.
photCL SCE 02 - 25254