Visual Materials
Dam 1
You might also be interested in

Dam 1
Visual Materials
Dam 1. Excavation for east pipe at upper end adjacent to existing concrete block below former location of valves. Hole was filled with concrete before forming 12" bearing walls under pipe extension.
photCL SCE 02 - 20131

Dam 1
Visual Materials
Dam 1. Photo #1 showing cribbing discovered during excavation for West 42" pipe at upper end adjacent to existing concrete.
photCL SCE 02 - 20129

Dam 1
Visual Materials
Dam 1. Photo #2 Cutting away cribbing found in excavating for foundation under West 42" sluice pipe. At upper end adjacent to existing concrete.
photCL SCE 02 - 20130

Dam 1
Visual Materials
Dam 1, View #2 showing excavation at upper end of center 42" pipe extension.
photCL SCE 02 - 20127

Dam 1
Visual Materials
Dam 1. View showing preliminary excavation with bull dozer at upper end of sluice pipe extension.
photCL SCE 02 - 20135

Dam 1
Visual Materials
Dam 1. View of 42" sluice valves showing removal of side concrete walls around valve enclosure prior to removing valves for relocation.
photCL SCE 02 - 20134