Big Creek, Florence Lake Dam
- Description
- Big Creek, Florence Lake Dam - 3.5 yard Dump cars for Tunnel #6.
- Date
- 3/14/1924
- Call number
- photCL SCE 02 - 12066
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Hauling material for rock surfacing of backfill from Florence Lake tunnel dump. .
photCL SCE 02 - 24824

Visual Materials
Big Creek, Florence Lake Dam - Old tunnel dump showing absence of wave erosion.
photCL SCE 02 - 28900

Visual Materials
Big Creek, Florence Lake Dam - Loaded batch cars for concrete lining of Florence Lake [Ward] Tunnel, Camp #62
photCL SCE 02 - 12276

Visual Materials
Big Creek, Florence Lake Dam - Loading batch cars with concrete for the lining of Florence Lake [Ward] Tunnel, Camp #62
photCL SCE 02 - 12277

Visual Materials
Big Creek, Florence Lake Dam - Concreting operations in Florence Lake [Ward] Tunnel showing batch cars near mixer.
photCL SCE 02 - 12416

Visual Materials
Big Creek, Florence Lake Dam - Concreting operations in Florence Lake [Ward] Tunnel showing batch cars at mixer.
photCL SCE 02 - 12417