Visual Materials
Big Creek, Florence Lake Dam
- Description
- Big Creek, Florence Lake Dam - Loaded batch cars for concrete lining of Florence Lake [Ward] Tunnel, Camp #62
- Date
- 7/25/1924
- Call number
- photCL SCE 02 - 12276
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Loading batch cars with concrete for the lining of Florence Lake [Ward] Tunnel, Camp #62
photCL SCE 02 - 12277

Visual Materials
Big Creek, Florence Lake Dam - Concrete Lining [of Ward Tunnel] - Camp 62.
photCL SCE 02 - 12201

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - View of reinforcing steel in place prior to shooting a 20-ft. circular section of gunite lining inside of present concrete lining in Ward Tunnel, approximately 3,000 ft. downstream from vertical shaft in Camp 61 Adit.
photCL SCE 02 - 26573

Visual Materials
Big Creek, Florence Lake Dam - New concrete lining in Florence Lake Tunnel, Camp #60.
photCL SCE 02 - 08513

Visual Materials
Big Creek, Florence Lake Dam - New concrete lining in Florence Lake Tunnel, Camp #60.
photCL SCE 02 - 08514

Visual Materials
Big Creek, Florence Lake Dam - New concrete lining in Florence Lake Tunnel, Camp #60.
photCL SCE 02 - 08515