Visual Materials
Big Creek, Florence Lake Dam
- Description
- Big Creek, Florence Lake Dam - Concreting operations in Florence Lake [Ward] Tunnel showing batch cars at mixer.
- Date
- 12/19/1924
- Call number
- photCL SCE 02 - 12417
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Concreting operations in Florence Lake [Ward] Tunnel showing batch cars near mixer.
photCL SCE 02 - 12416

Visual Materials
Big Creek, Florence Lake Dam - Loaded batch cars for concrete lining of Florence Lake [Ward] Tunnel, Camp #62
photCL SCE 02 - 12276

Visual Materials
Big Creek, Florence Lake Dam - Loading batch cars with concrete for the lining of Florence Lake [Ward] Tunnel, Camp #62
photCL SCE 02 - 12277

Visual Materials
Big Creek, Florence Lake Dam - Concrete mixer in Florence Lake Tunnel, Camp 63.
photCL SCE 02 - 22982
Image not available
Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel at outlet (Camp 60) showing the telemark.
photCL SCE 02 - 27329

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel intake trashracks showing pitting after 22 years.
photCL SCE 02 - 27528