Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Kern River No. 1 - Pond Gauge at powerhouse tailrace pond reading above 5' indicating SJL&P is spilling water at dam.
photCL SCE 02 - 11067

Visual Materials
Kern River No. 1 - Powerhouse tailrace recorder & weir looking upstream. [SJL&P Corp. spring water over dam when picture was taken.]
photCL SCE 02 - 11065

Visual Materials
Kern River No. 1 - Kern River at high water near powerhouse.
photCL SCE 02 - 02507

Visual Materials
Kern River No. 1 - Pond above Democrat Dam. [A boat with a sail is on the pond].
photCL SCE 02 - 01180

Visual Materials
Kern River No. 1 - Pond above Democrat Dam [with intake on left end of dam, downstream view]
photCL SCE 02 - 01179
Image not available
Visual Materials
Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.
photCL SCE