Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Kern River Miscellaneous - Rio Bravo looking upstream from the upper dam site showing ponding space that will be made when dam is built. #2
photCL SCE 02 - 00833

Visual Materials
Kern River No. 1 - Pond Gauge at powerhouse tailrace pond reading above 5' indicating SJL&P is spilling water at dam.
photCL SCE 02 - 11067

Visual Materials
Kern River #1 - The spillway discharge, looking upstream from the powerhouse.
photCL SCE 01 - 00720

Visual Materials
Kern River No. 1 - SJL&P Corp. dam at Powerhouse 1. Water spills at 6 ht., 5ft. on pond gauge.
photCL SCE 02 - 11070
Image not available
Visual Materials
Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.
photCL SCE