Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Kern River No. 1 - SJL&P Corp. dam at Powerhouse 1. Water spills at 6 ht., 5ft. on pond gauge.
photCL SCE 02 - 11070
Image not available
Visual Materials
Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.
photCL SCE

Visual Materials
Kern River No. 1 - Pond above Democrat Dam. [A boat with a sail is on the pond].
photCL SCE 02 - 01180

Visual Materials
Kern River No. 1 - The tailrace [and afterbay at Kern River #1 viewed from above.]
photCL SCE 02 - 01031

Visual Materials
Kern River No. 1 - Pond above Democrat Dam [with intake on left end of dam, downstream view]
photCL SCE 02 - 01179

Visual Materials
Kern River No. 1 - Powerhouse tailrace recorder & weir looking upstream. [SJL&P Corp. spring water over dam when picture was taken.]
photCL SCE 02 - 11065