Visual Materials
Big Creek PH #2
You might also be interested in

Big Creek PH #2
Visual Materials
Big Creek PH #2 - Looking upstream at Powerhouse #2, showing the present stage of work on Powerhouse 2a.
photCL SCE 02 - 14316

Big Creek Powerhouse 2a
Visual Materials
Big Creek Powerhouse 2a - Construction (framing stage) - Close-up view of the foundation, wheel pits, structural steel, etc. for Powerhouse #2A.
photCL SCE 02 - 14731

Big Creek - Powerhouse #2 & 2a (part 3)
Visual Materials
Big Creek - Powerhouse #2 & 2a (part 3) [Construction at Powerhouse 2A, manufacturing photos showing the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at PH 2A.]
photCL SCE 13 - vol 031

Big Creek PH#2
Visual Materials
Big Creek PH#2 - Showing Camp #7 intake to PH #8 tunnel and forebay and Incline #2 bridge across Big Creek. The boom across the forebay was placed there to prevent any timbers, boards, ect., that might be released during PH #2A construction from going down either to the trash rack structure, or over the flashboards of Dam #5.
photCL SCE 02 - 14809

Big Creek PH #2
Visual Materials
Big Creek PH #2 - [Powerhouse 2, inclined railroad, and construction camp below.]
photCL SCE 02 - 05408

Big Creek PH #2 - Construction progress
Visual Materials
Big Creek PH #2 - Construction progress - Powerhouse #2
photCL SCE 02 - 12244