Visual Materials
Big Creek, Shaver Lake Dam
- Description
- Big Creek, Shaver Lake Dam - Looking north across the dam, showing the uncompleted sections at the south end.
- Date
- 9/1/1927
- Call number
- photCL SCE 02 - 14709
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Shaver Lake Dam - Looking north from south end of Shaver Dam, showing concrete poured in shallow trench between extreme south end of dam and the small tower.
photCL SCE 02 - 14374

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - looking South across sections ready for concrete.
photCL SCE 02 - 14250

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - looking South across sections ready for concrete.
photCL SCE 02 - 14251

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - looking South across sections ready for concrete.
photCL SCE 02 - 14252

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Looking south over concrete sections already poured as of November 6th, and showing the three steel towers. The two end ones were used in the construction of the multiple arch dam at Florence Lake.
photCL SCE 02 - 14293

Visual Materials
Big Creek, Shaver Lake Dam - Looking south across top of Shaver Lake Dam.
photCL SCE 02 - 14358