Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek looking south across first section of concrete being poured, showing good view of cutoff trench at left, with arrangement of grout pipes at toe. This view gives a good idea of nature of foundation for next two sections north of the first section being poured.
photCL SCE 02 - 14249

Visual Materials
Big Creek, Shaver Lake Dam - Looking north from south end of Shaver Dam, showing concrete poured in shallow trench between extreme south end of dam and the small tower.
photCL SCE 02 - 14374

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Close-up view of cutoff trench immediately north of first section being poured. The bridge in upper part of picture was used for transporting.
photCL SCE 02 - 14254

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Looking south over concrete sections already poured as of November 6th.
photCL SCE 02 - 14294

Visual Materials
Big Creek, Shaver Lake Dam - Closeup view of first fifty foot section as it appeared on September 16th, showing good view of arrangement of panel forms and some of the concrete which has already been stripped. Two of the two-yard Smith mixers are shown in the mixing plant and the third one is now being installed. .
photCL SCE 02 - 14240

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Looking south over concrete sections already poured as of November 6th, and showing the three steel towers. The two end ones were used in the construction of the multiple arch dam at Florence Lake.
photCL SCE 02 - 14293