Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek looking south across first section of concrete being poured, showing good view of cutoff trench at left, with arrangement of grout pipes at toe. This view gives a good idea of nature of foundation for next two sections north of the first section being poured.
photCL SCE 02 - 14249

Visual Materials
Big Creek, Shaver Lake Dam - Looking North across sections ready for receiving concrete and also showing first section being poured with some of the concrete already having been stripped. Please note the arrangement of the grout pipe along the cutoff trench in foreground.
photCL SCE 02 - 14243

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Looking south over concrete sections already poured as of November 6th, and showing the three steel towers. The two end ones were used in the construction of the multiple arch dam at Florence Lake.
photCL SCE 02 - 14293

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Looking south over concrete sections already poured as of November 6th.
photCL SCE 02 - 14294

Visual Materials
Big Creek, Shaver Lake Dam - Camp 21 used in the construction of Shaver Dam, showing construction [mixing] plant, dam excavation in the foreground, Lakewood tower, concrete poured at dam, and storage piles of crushed material.
photCL SCE 02 - 14256

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Close-up of the double Lakewood steel tower and sections of concrete poured as of November 6th.
photCL SCE 02 - 14292