Visual Materials
Big Creek, Shaver Lake Dam - Close-up view of mixing plant and Lakewood tower. Three of the stock piles show up very well in the background.
photCL SCE 02 - 14238

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Close-up of the double Lakewood steel tower and sections of concrete poured as of November 6th.
photCL SCE 02 - 14292

Visual Materials
Big Creek, Shaver Lake Dam - Looking North across sections ready for receiving concrete and also showing first section being poured with some of the concrete already having been stripped. Please note the arrangement of the grout pipe along the cutoff trench in foreground.
photCL SCE 02 - 14243

Visual Materials
Big Creek, Shaver Lake Dam - Northwest Gas Shovel at work in the excavation at the north end of the Shaver Lake Dam. The man standing just below the team of horses in the upper central part of the picture is at approximately elevation 5370, which will be the top of the Shaver Dam. The excavation at this point has been made wider than really necessary for the dam in ordcer to secure material to make the fill for the bottom of the storage piles.
photCL SCE 02 - 14020

Visual Materials
Big Creek, Shaver Lake Dam - Looking across main channel of Stevenson Creek towards foundation on south side, showing general cleanup of bottom between Stevenson Creek channel and higher part of foundation. The piles of rock noticed in the picture are to be distributed into the concrete when this particuloar section is poured.
photCL SCE 02 - 14239

Visual Materials
Big Creek, Shaver Lake Dam - Looking north from south end of Shaver Dam, showing concrete poured in shallow trench between extreme south end of dam and the small tower.
photCL SCE 02 - 14374