Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Looking south over concrete sections already poured as of November 6th.
photCL SCE 02 - 14294

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Looking south over concrete sections already poured as of November 6th, and showing the three steel towers. The two end ones were used in the construction of the multiple arch dam at Florence Lake.
photCL SCE 02 - 14293

Visual Materials
Big Creek, Shaver Lake Dam - Camp 21 used in the construction of Shaver Dam, showing construction [mixing] plant, dam excavation in the foreground, Lakewood tower, concrete poured at dam, and storage piles of crushed material.
photCL SCE 02 - 14256

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - This view, while similar to A-656, does not show quite all of the double tower, but does show all of the concrete sections.
photCL SCE 02 - 14295

Visual Materials
Big Creek, Shaver Lake Dam - Showing front view of Smith mixers and the arrangement of the hoppers on the double compartment Lakewood Tower.
photCL SCE 02 - 14301

Visual Materials
Big Creek, Shaver Lake Dam - Looking north from south end of Shaver Dam, showing concrete poured in shallow trench between extreme south end of dam and the small tower.
photCL SCE 02 - 14374