Visual Materials
Big Creek, Shaver Lake Dam - Showing the boom plant on double compartment Lakewood Tower. - Status of construction, center portion of Shaver Dam at end of first concreting season. (Panel form system is shown.) .
photCL SCE 02 - 14302

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Close-up of the double Lakewood steel tower and sections of concrete poured as of November 6th.
photCL SCE 02 - 14292

Visual Materials
Big Creek, Shaver Lake Dam - Camp 21 used in the construction of Shaver Dam, showing construction [mixing] plant, dam excavation in the foreground, Lakewood tower, concrete poured at dam, and storage piles of crushed material.
photCL SCE 02 - 14256

Visual Materials
Big Creek, Shaver Lake Dam - Close-up view of mixing plant and Lakewood tower. Three of the stock piles show up very well in the background.
photCL SCE 02 - 14238

Visual Materials
Big Creek, Shaver Lake Dam - Closeup view of first fifty foot section as it appeared on September 16th, showing good view of arrangement of panel forms and some of the concrete which has already been stripped. Two of the two-yard Smith mixers are shown in the mixing plant and the third one is now being installed. .
photCL SCE 02 - 14240

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - This view, while similar to A-656, does not show quite all of the double tower, but does show all of the concrete sections.
photCL SCE 02 - 14295