Big Creek, Shaver Lake Dam - Looking upstream at downstream side of dam (note stairway) - Status of construction early in second season. (Temporary concrete handling ramp to auxiliary chuting towers shown bracketed to completed concrete). Entrance to inspection tunnel, and sluice pipe are in left foreground.
photCL SCE 02 - 14354

Visual Materials
Big Creek, Florence Lake Dam - View from about 500 feet upstream and looking N, showing plant and construction for river section of dam. (The derrick shown in the center foreground was used for handling all heavy construction material, particularly gates and racks. The East or river section chuting tower and mixing plant are at left center. Top of west chuting tower and mast for aggregate plant derrick can be seen in background. Angle buttress 49 shown to left of mixing plant.
photCL SCE 02 - 12734

Visual Materials
Big Creek, Shaver Lake Dam - Looking downstream at the upstream face of the dam, showing the main section completed. Almost the same view as A769, except there is some more of the dam shown at the south end; also the complete chuting line and counterweight chutes at the end on both the center tower and the south tower.
photCL SCE 02 - 14707

Visual Materials
Big Creek, Shaver Lake Dam - Looking South across central section of Shaver Lake Dam - showing upstream face. - View from upstream side North end, showing status of construction during middle of second construction season. Form work for upper half of inspection gallery shown in center of nearest concrete block.
photCL SCE 02 - 14377

Visual Materials
Big Creek, Shaver Lake Dam - Looking south across top of Shaver Lake Dam.
photCL SCE 02 - 14358

Visual Materials
Big Creek, Shaver Lake Dam - Mixing plant at Shaver Dam construction site.
photCL SCE 02 - 14099