Big Creek, Shaver Lake Dam - Looking upstream at downstream side of dam (note stairway)
You might also be interested in

Big Creek, Shaver Lake Dam - Shaver Lake Dam - Pouring foundation
Visual Materials
Big Creek, Shaver Lake Dam - Shaver Lake Dam - Pouring foundation. South abutment excavation, early concrete work, and construction plant for Shaver Dam in the fall of 1926. Mixing plant and aggregate handling trestle in middle foreground. Single-compartment chuting towers at right and left. Double-compartment tower in center. (B458)
photCL SCE 02 - 22942

Big Creek, Shaver Lake Dam
Visual Materials
Big Creek, Shaver Lake Dam - Looking south across top of Shaver Lake Dam. - Status of construction early in second season. Chuting system, mixing plant, cement-handling facilities, and original Shaver Dam are shown.
photCL SCE 02 - 14357

Big Creek, Shaver Lake Dam
Visual Materials
Big Creek, Shaver Lake Dam - Looking east at downstream face of Shaver Dam in vicinity near sluice pipe and main entrance to inspection gallery. This view shows more leakage than any of the others.
photCL SCE 02 - 14858

Big Creek, Shaver Lake Dam - Looking South across central section of Shaver Lake Dam - showing upstream face
Visual Materials
Big Creek, Shaver Lake Dam - Looking South across central section of Shaver Lake Dam - showing upstream face. - View from upstream side North end, showing status of construction during middle of second construction season. Form work for upper half of inspection gallery shown in center of nearest concrete block.
photCL SCE 02 - 14377

Big Creek, Florence Lake Dam - Looking west
Visual Materials
Big Creek, Florence Lake Dam - Looking west - Temporary opening for sluice gate [Arch 53].
photCL SCE 02 - 12761

Big Creek, Shaver Lake Dam
Visual Materials
Big Creek, Shaver Lake Dam - View of Shaver Dam, showing particularly Section 18, which was left low when work was stopped late in 1926 and to allow for spillway. This section is now being brought up along with the others but will be kept four feet lower for a while. The track running up along the face of the dam lengthwise of the picture is the one over which concrete will be supplied to one of the towers not shown in the picture and which tower will be out of reach of the chuting system. .
photCL SCE 02 - 14325