Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek looking south across first section of concrete being poured, showing good view of cutoff trench at left, with arrangement of grout pipes at toe. This view gives a good idea of nature of foundation for next two sections north of the first section being poured.
photCL SCE 02 - 14249

Visual Materials
Big Creek, Shaver Lake Dam - Looking north from south end of Shaver Dam, showing concrete poured in shallow trench between extreme south end of dam and the small tower.
photCL SCE 02 - 14374

Visual Materials
Big Creek, Shaver Lake Dam - Looking upstream through main channel of Stevenson Creek, showing foundation in its final state and as it will be when covered with concrete.
photCL SCE 02 - 14241

Visual Materials
Big Creek, Shaver Lake Dam - Looking North across sections ready for receiving concrete and also showing first section being poured with some of the concrete already having been stripped. Please note the arrangement of the grout pipe along the cutoff trench in foreground.
photCL SCE 02 - 14243

Visual Materials
Big Creek, Shaver Lake Dam - Looking across main channel of Stevenson Creek towards foundation on south side, showing general cleanup of bottom between Stevenson Creek channel and higher part of foundation. The piles of rock noticed in the picture are to be distributed into the concrete when this particuloar section is poured.
photCL SCE 02 - 14239

Visual Materials
Big Creek, Shaver Lake Dam - Looking downstream at the upstream face of the dam, showing the main section completed.
photCL SCE 02 - 14705