Big Creek, Shaver Lake Dam
- Description
- Big Creek, Shaver Lake Dam - On the left side of the picture is the fill which has been made for the bottom of the lower side of the storage piles. The tunnel in which the concrete aggregate will be loaded into cars is shown just beyond the mast of the derrick. The secondary crusher is being installed just below the wagon shown in the central part of the picture while the screening plant is located just in front of the wagon. The excavation shown just below the mule is for the primary crusher, the foundation for which is now being poured. The trestle bents in the central part of the picture will carry the track out onto the primary crusher and after passing beyond the curusher the empty trains will return to the quarry on the trestle shown on the right. .
- Date
- 7/3/1926