Visual Materials
Worker housing at construction camp #29 - used in the construction of Shaver Tunnel for PH 2 & 2a, showing the prefabricated redwood bunk
You might also be interested in

Shaver tunnel. Adit #5. Tent Camp 19
Visual Materials
Shaver tunnel. Adit #5. Tent Camp 19 - used in the construction of Shaver Tunnel for Powerhouse 2 & 2a.
photCL SCE 02 - 05760

Big Creek PH#2 & 2A
Visual Materials
Big Creek PH#2 & 2A - Tunnel #5, Camp 19 Dump.
photCL SCE 02 - 25566

Shaver Lake Dam during construction
Visual Materials
Shaver Lake Dam during construction. Tunnel portal looking towards Dam 2 from Camp 71.
photCL SCE 02 - 14069

Big Creek PH#2
Visual Materials
Big Creek PH#2 - Showing Camp #7 intake to PH #8 tunnel and forebay and Incline #2 bridge across Big Creek. The boom across the forebay was placed there to prevent any timbers, boards, ect., that might be released during PH #2A construction from going down either to the trash rack structure, or over the flashboards of Dam #5.
photCL SCE 02 - 14809

Big Creek PH #2 - Camp #5 Yards, Construction
Visual Materials
Big Creek PH #2 - Camp #5 Yards, Construction - Forebay #2.
photCL SCE 02 - 12044