Visual Materials
Big Creek PH#2 & 2A
- Description
- Big Creek PH#2 & 2A - Tunnel #5, Camp 19 Dump.
- Date
- 10/30/1942
- Call number
- photCL SCE 02 - 25566
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek PH#2 - Showing Camp #7 intake to PH #8 tunnel and forebay and Incline #2 bridge across Big Creek. The boom across the forebay was placed there to prevent any timbers, boards, ect., that might be released during PH #2A construction from going down either to the trash rack structure, or over the flashboards of Dam #5.
photCL SCE 02 - 14809

Visual Materials
Big Creek PH#2 & 2A - Dam #5 at time of annual inspection by the State.
photCL SCE 02 - 26374

Visual Materials
Big Creek Powerhouse #2 & 2A - Crushing plant, Tunnel 2, Adit 2 dump
photCL SCE 02 - 28318

Visual Materials
Big Creek Powerhouse 2 & 2a - Assembling rock crusher, Tunnel 2, Adit 2 dump.
photCL SCE 02 - 28235

Visual Materials
Big Creek Powerhouse 2 & 2a - Tunnel, assembling rock crusher for Adit 2 dump.
photCL SCE 02 - 28231

Visual Materials
Big Creek PH#2 & 2A - Installing OB bushings, B.C. 2 & 2A line - 220kV oil circuit breakers. .
photCL SCE 02 - 25477