Visual Materials
Big Creek PH#2 & 2A
You might also be interested in

Big Creek PH#2
Visual Materials
Big Creek PH#2 - Showing Camp #7 intake to PH #8 tunnel and forebay and Incline #2 bridge across Big Creek. The boom across the forebay was placed there to prevent any timbers, boards, ect., that might be released during PH #2A construction from going down either to the trash rack structure, or over the flashboards of Dam #5.
photCL SCE 02 - 14809

Big Creek PH#2 & 2A
Visual Materials
Big Creek PH#2 & 2A - Dam #5 at time of annual inspection by the State.
photCL SCE 02 - 26374

Big Creek Powerhouse #2 & 2A
Visual Materials
Big Creek Powerhouse #2 & 2A - Crushing plant, Tunnel 2, Adit 2 dump
photCL SCE 02 - 28318

Big Creek Powerhouse 2 & 2a
Visual Materials
Big Creek Powerhouse 2 & 2a - Assembling rock crusher, Tunnel 2, Adit 2 dump.
photCL SCE 02 - 28235

Big Creek Powerhouse 2 & 2a
Visual Materials
Big Creek Powerhouse 2 & 2a - Tunnel, assembling rock crusher for Adit 2 dump.
photCL SCE 02 - 28231

Big Creek PH#2 & 2A - Installing OB bushings, B.C. 2 & 2A line
Visual Materials
Big Creek PH#2 & 2A - Installing OB bushings, B.C. 2 & 2A line - 220kV oil circuit breakers. .
photCL SCE 02 - 25477