Construction of Big Creek No. 4, Dam 7, Redinger Lake


You might also be interested in

  • Image not available

    Dedication of Big Creek No. 4, Dam 7, Redinger Lake

    Visual Materials

    Dedication ceremony of Dam 7 of Big Creek No. 4 at Redinger Lake with scenes of crowds, speakers on a dais, and views of the dam itself.

    photCL SCE

  • Image not available

    Stone & Webster Engineering Corp. - Big Creek construction photos

    Visual Materials

    Early construction photographs of Big Creek, including Powerhouse No. 2 construction, including pouring walls and sluicing below Powerhouse No. 2; Camp 7; crushing plant; generator room; Construction at Dams No. 1, No. 2, No. 3 and No. 4; Intake at Dam 1. Photographs by Stone & Webster Engineering Corporation.

    photCL SCE

  • Image not available

    Big Creek: Construction of Dam No. 6, San Joaquin River

    Visual Materials

    Album with a printed introductory page detailing the construction of Big Creek Dam No. 6 on the San Joaquin River, including dam site, abutments, drilling test cores in riverbed, and building the bypass flume.

    photCL SCE

  • Image not available

    Long Beach Steam Station construction, Big Creek, Mill Creek, Santa Ana River, Big Bear Lake

    Visual Materials

    Long Beach Steam Station No. 1 construction, interior of generator floor; man with divining rods; Kern River No. 3, including headquarters camp, plant site, river, Fairview Dam with fish ladder; Big Creek, including Huntington Lake, Huntington Lake Lodge, Dam 4, cottages, Powerhouse No. 8, road construction to Powerhouse No. 3; Santa Barbara facilities, including Substations, car barn, steam plants; Mill Creek No. 1, Santa Ana River No. 2 flowline, Santa Ana River No. 1 intake and siphon; Union Power Co. hydroelectric projects, such as multiple arch dam at Big Bear lake, tunnels and adits.

    photCL SCE

  • Image not available

    Big Creek: Dams

    Visual Materials

    Photographs of Dams 1, 2, 3, 3A, 5 and 6 including Dam 1 intake tower (interior and exterior), seepage, sluice pipes, spilling over top and through spillways, automatic siphons; Dam 2 - watchman's house; Dam 3 and 3A; Dam 4 spilling; Dam 5 - site excavation, forms up, diversion flume, dam construction, trash rack, sluicing mud banks, Powerhouse 8 forebay construction; Dam 6 - site excavation, construction, coffer dam, diversion, framework, primary rock crusher No. 9, Tunnel 3 intake, Dam 6 spilling.

    photCL SCE

  • Image not available

    Construction of Big Creek Powerhouse No. 1 and No. 2

    Visual Materials

    Photographs by Stone and Webster Construction Co. documenting construction of Big Creek Powerhouse No. 1 and Powerhouse No. 2 in Fresno Co., California. Job Order No. 1142

    photCL SCE