Perry Hornsby's family photos; with Big Creek photos - compressor house, sled dog team, Camp 33, 35, 38, & 61, General Office, Huntington Lodge, mess hall, Stevenson Creek Falls, Shaver Sawmill, SJ&E Climax locomotive #107, hoist; construction at: (Dam 5, Dam 6, Intake 3, PH 3, PH 8, diver at intake, Penstock blow-out at PH 8); Kern River #3 construction
photCL SCE 13 - vol 060
Image not available
Visual Materials
Early construction photographs of Big Creek, including Powerhouse No. 2 construction, including pouring walls and sluicing below Powerhouse No. 2; Camp 7; crushing plant; generator room; Construction at Dams No. 1, No. 2, No. 3 and No. 4; Intake at Dam 1. Photographs by Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Visual Materials
Photograph album of Edison employee, Kingsley A. Dutton, including pictures of Borel Powerhouse and interiors; Big Creek Powerhouse No. 1; Dam 4; Cascada; incline railway and hoist; Kern River No. 1; Kern River No. 3; Tule Powerhouse; Eagle Rock Substation; and Fairview Dam. Personal snapshots include views of Glendale, Griffith Park, early motorcycles, the Los Angeles Aqueduct, and a Boston terrier.
photCL SCE
Image not available
Visual Materials
Long Beach Steam Station No. 1 construction, interior of generator floor; man with divining rods; Kern River No. 3, including headquarters camp, plant site, river, Fairview Dam with fish ladder; Big Creek, including Huntington Lake, Huntington Lake Lodge, Dam 4, cottages, Powerhouse No. 8, road construction to Powerhouse No. 3; Santa Barbara facilities, including Substations, car barn, steam plants; Mill Creek No. 1, Santa Ana River No. 2 flowline, Santa Ana River No. 1 intake and siphon; Union Power Co. hydroelectric projects, such as multiple arch dam at Big Bear lake, tunnels and adits.
photCL SCE
Image not available
Visual Materials
Big Creek rivers and streams; Powerhouse 2 interior; Cascada general office; Huntington Lake Lodge, Huntington Lake and Dam 1, Shaver Lake, Powerhouse No. 2, Powerhouse No. 8 interior and exterior, Dam 6 and Intake 3, Powerhouse No. 3; Vestal, Eagle Rock Substation, Laguna Bell Substation; Mill Creek No. 1 exterior and interior; Kern River No. 3 exterior and interior, Kern River No. 1 interior; Long Beach Steam Plant No. 1; Camp on Eagle-Bell Line near San Gabriel; Edison Executive portraits; and Edison General Office at 3rd and Broadway, Los Angeles.
photCL SCE
Image not available
Visual Materials
Early construction photographs of Big Creek. Includes views of gravel pit, sluicing Powerhouse No. 2 site; Powerhouse 1 under construction; Powerhouse 2 under construction; Units 1 and 2 at Powerhouse 1; Powerhouse 2 switchboard, generator, Hoist No. 2, oil switch room, 6600 V switch room, local service switchboard, generator assembly; Tunnel 2 - adit 1, 2, 3, 4, 5, 6, 7, and 8; Intake to Tunnel 1, 9' flow pipe, west portal Tunnel 1, concreting surge tank at West Portal Tunnel 2. Photographs by Stone & Webster Engineering Corporation.
photCL SCE