Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Employee album: Kingsley Dutton's family photos; Big Creek and Kern River


You might also be interested in

  • Image not available

    Employee album: Perry Hornsby's family photos and Big Creek

    Visual Materials

    Photographs of Big Creek compiled by Edison employee, Perry Hornsby, including views of compressor house, sled dog team, Camp 33, 35, 38, and 61, General Office, Huntington Lodge, mess hall, Stevenson Creek Falls, Shaver Sawmill, San Joaquin and Eastern Climax locomotive No. 107, hoist; construction at Dam 5, Dam 6, Intake 3, Powerhouse 3, Powerhouse 8, diver at intake, Penstock blow-out at Powerhouse 8; Kern River No. 3 construction.

    photCL SCE

  • Image not available

    Big Creek, Mill Creek, Kern River, etc

    Visual Materials

    Big Creek rivers and streams; Powerhouse 2 interior; Cascada general office; Huntington Lake Lodge, Huntington Lake and Dam 1, Shaver Lake, Powerhouse No. 2, Powerhouse No. 8 interior and exterior, Dam 6 and Intake 3, Powerhouse No. 3; Vestal, Eagle Rock Substation, Laguna Bell Substation; Mill Creek No. 1 exterior and interior; Kern River No. 3 exterior and interior, Kern River No. 1 interior; Long Beach Steam Plant No. 1; Camp on Eagle-Bell Line near San Gabriel; Edison Executive portraits; and Edison General Office at 3rd and Broadway, Los Angeles.

    photCL SCE

  • Image not available

    Long Beach Steam Station construction, Big Creek, Mill Creek, Santa Ana River, Big Bear Lake

    Visual Materials

    Long Beach Steam Station No. 1 construction, interior of generator floor; man with divining rods; Kern River No. 3, including headquarters camp, plant site, river, Fairview Dam with fish ladder; Big Creek, including Huntington Lake, Huntington Lake Lodge, Dam 4, cottages, Powerhouse No. 8, road construction to Powerhouse No. 3; Santa Barbara facilities, including Substations, car barn, steam plants; Mill Creek No. 1, Santa Ana River No. 2 flowline, Santa Ana River No. 1 intake and siphon; Union Power Co. hydroelectric projects, such as multiple arch dam at Big Bear lake, tunnels and adits.

    photCL SCE

  • Image not available

    Borel, Kern River No. 3, Santa Ana River No. 1, Mill Creek, PL&P construction photos from 1903, and Bear Valley Dam (Union Power Co.)

    Visual Materials

    Photographs of Borel flume and canal work (mostly un-numbered), Borel headworks, Borel Powerhouse, Kern River No. 3 construction, Santa Ana River No. 1 powerhouse, Santa Ana River 1 intake, Santa Ana River 1 settling basin, Santa Ana River No. 2 powerhouse, Mill Creek No. 1 Powerhouse, Mill Creek No. 3 intake, Mill Creek cottages, Santa Ana River No. 3 flume construction, Pacific Light & Power construction Photographs from 1903, Bear Valley Dam (Union Power Co.), Mill Creek 2 and 3 Powerhouse, Santa Ana River flood damage.

    photCL SCE

  • Image not available

    Big Creek projects and Colorado River survey

    Visual Materials

    Big Creek Project - Penstock sections, Powerhouse No. 1 (Unit 4 installation), Powerhouse No. 2, Florence Lake Dam construction (framing for concrete), Camp Hospitals, Cookhouse, Warehouse, Recreation Hall, Mess Halls, tunnel excavations, Construction Camps (No. 21, No. 64, No. 72, No. 73); Photographs of Colorado River Survey of Sierra Watershed, including Evolution Lake, Garnet Lake, Wanda Lake, Thousand Island Lake, Heart Lake, Desolation Lake, N. Goddard Lake, and Sapphire Lake; Kern River No. 1; Transmission tower construction; [Big Bear dam construction]; Huntington Lake Dam 1; Shaver Dam construction.

    photCL SCE

  • Image not available

    Kern River No. 1

    Visual Materials

    Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.

    photCL SCE