Visual Materials
Big Creek: Hydro-electric project photo postcard album
You might also be interested in

Big Creek - Hydroelectric project photos
Visual Materials
Big Creek - Hydroelectric project photos [Big Creek - commercial postcards, Powerhouse 1 & 2, exciter, gate control, generator floor, Cascada cottages, Dam #4, SJ&E train nearing Cascada, train coming into Cascada station, Bear Creek, Pitman Creek, Magunden Sub.; Kaweah #3 Switchboard; Toronto Power Co. - Niagara Powerhouse generator floor, Transformer Station, #8 Governor, Switchboards, switchrack, magnetic relays, forebay; Front Street Power Station (AC side, and DC side)]
photCL SCE 13 - vol 049
Image not available
Employee album of Big Creek
Visual Materials
Photographs of Big Creek compiled by Edison employee, Perry Hornsby, including Powerhouse 3 control room, Cascada Drug Store, Accounting Office, Mess Hall, Powerhouse3 generator floor, Camps 63 and 65, School House, Clubhouse/dormitory, Powerhouse 1 in snow, Dam 6, Powerhouse 3, Huntington Lake Lodge, Hospital, sled dog team, tunnel work, and Florence Lake.
photCL SCE
Image not available
Stone & Webster Engineering Corp. - Big Creek construction photos
Visual Materials
Early construction photographs of Big Creek, including grading for hoist line, sawmill, railway grade construction, gravel washer, reservoir from Dam 1 [Huntington Lake], east portal Tunnel No. 3, logging; Big Creek Dam 2 and Dam site 3; Big Creek Camp 1, gravel pit, gravel washer; Big Creek crossing at foot of incline [Powerhouse No. 1 site]; Train No. 103 at Cascada; Train leaving for El Prado; Cascada Falls on Pitman Creek; Cascada yards; Hoist No. 2; Warehouse, planning mill, and lumber yards. Photographs by Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Big Creek: Powerhouse No. 8 (part 1)
Visual Materials
Powerhouse No. 8, Part One. Photographs of Dam 6, Camp 34, Camp 38, overview of Powerhouse 8 and penstock, milling Powerhouse 8 draft tube, operator's cottage, forebay, sluicing tailrace, generator floor, switchboard, rocks washed into tailrace after penstock burst, Unit No. 2 at Pelton Water Wheel Co., generator and governor at Powerhouse 8, penstock vent, transformers and bus, station power sets, switchboard, broken penstock, drilling tunnel No. 8, repaired penstock, steel forebay, Camp 32 cook house, Johnson Valve, Camp 33.
photCL SCE
Image not available
Long Beach Steam Station construction, Big Creek, Mill Creek, Santa Ana River, Big Bear Lake
Visual Materials
Long Beach Steam Station No. 1 construction, interior of generator floor; man with divining rods; Kern River No. 3, including headquarters camp, plant site, river, Fairview Dam with fish ladder; Big Creek, including Huntington Lake, Huntington Lake Lodge, Dam 4, cottages, Powerhouse No. 8, road construction to Powerhouse No. 3; Santa Barbara facilities, including Substations, car barn, steam plants; Mill Creek No. 1, Santa Ana River No. 2 flowline, Santa Ana River No. 1 intake and siphon; Union Power Co. hydroelectric projects, such as multiple arch dam at Big Bear lake, tunnels and adits.
photCL SCE
Image not available
Employee album: Kingsley Dutton's family photos; Big Creek and Kern River
Visual Materials
Photograph album of Edison employee, Kingsley A. Dutton, including pictures of Borel Powerhouse and interiors; Big Creek Powerhouse No. 1; Dam 4; Cascada; incline railway and hoist; Kern River No. 1; Kern River No. 3; Tule Powerhouse; Eagle Rock Substation; and Fairview Dam. Personal snapshots include views of Glendale, Griffith Park, early motorcycles, the Los Angeles Aqueduct, and a Boston terrier.
photCL SCE