Visual Materials
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Distant view of the downstream face of Dam #7 during construction.
photCL SCE 05 - 54326

Visual Materials
View across downstream face of Dam 7 from intake tunnel side, probably during the dedication of Redinger Lake and Big Creek 4 project. - no documentation.
photCL SCE 05 - 54800

Visual Materials
California Electric Power Corp. - downstream face of Hoover Dam during construction showing facilities under construction in the de-watered river section.
photCL SCE 07 - 02613

Visual Materials
Big Creek #4 project: Close-up across downstream face of Dam 7, almost complete from left side. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.
photCL SCE 10 - 00093

Visual Materials
Big Creek - Mammoth Pool - General view - diversion tunnel outlet and downstream dam face.
photCL SCE 06 - 46151

Visual Materials
Big Creek #4 project: Shot of downstream face of Dam 7, head-on at crest level. Dam is almost complete, but gates have not been installed yet. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.
photCL SCE 10 - 00094