First delivery of electric power to the booming mining camps of Tonopah and Goldfield was in October, 1905. The following Fourth of July, miners and citizens enthusiastically celebrated the arrival of the electric age with a horse drawn float, shown here in front of the power company's Tonopah office. Pg. 68
photCL SCE 11 - 00138

Visual Materials
Crew constructing the redwood-stave flowline for Bishop Creek Powerhouse #4 (1904-1905) - Nevada Mining, Milling and Power Co. (Cal Electric Power Co.).
photCL SCE 11 - 00146

Visual Materials
Chief Engineer Charles O. Poole looking at the dam at the intake to Plant Four on Bishop Creek, 1905. Pg. 78.
photCL SCE 11 - 00163

Visual Materials
Named Plant Four although it was the first hydro plant built on Bishop Creek, the facility had grown ivy-covered walls by the time this photo was taken in 1923. Pg. 70.
photCL SCE 11 - 00142

Visual Materials
One tower of Edison's growing network of 500kV transmission lines stands sentinel in Cajon Pass in the winter of 1973. Pg. 226.
photCL SCE 11 - 00457

Visual Materials
Raising a pole by "horse-whim" during the building of the 55 kV line to Banning in 1913. This was the first leg of Southern Sierras' extension into the Imperial Valley. Pg. 127
photCL SCE 11 - 00263