Visual Materials

Building foundations for new units



You might also be interested in

  • Image not available

    Long Beach Steam Plant No. 2

    Visual Materials

    Building foundations for new units, pouring concrete in foundation forms from tower, pouring concrete for additional unit in Plant No. 1, installing fourth boiler bank in Plant No. 1, Plant 2 machine shop, discharge tunnel, steel framework going up, first aid station, and concrete being poured into wall forms.

    photCL SCE

  • Long Beach Steam Station, Plant #1

    Long Beach Steam Station, Plant #1

    Visual Materials

    Long Beach Steam Station, Plant #1 - Pouring concrete on the roof of the Boiler Room for Plant #1.

    photCL SCE 02 - 00544

  • Long Beach Steam Station, Plant #1

    Long Beach Steam Station, Plant #1

    Visual Materials

    Long Beach Steam Station, Plant #1 - Pouring concrete at end of discharge.

    photCL SCE 02 - 02367

  • Long Beach Steam Station, Plant #1

    Long Beach Steam Station, Plant #1

    Visual Materials

    Long Beach Steam Station, Plant #1 - Pouring concrete at end of discharge.

    photCL SCE 02 - 02366

  • Long Beach Steam Station, Plant #3

    Long Beach Steam Station, Plant #3

    Visual Materials

    Long Beach Steam Station, Plant #3 - Pouring concrete for new discharge tunnel.

    photCL SCE 02 - 13951

  • Image not available

    Long Beach Steam Station

    Visual Materials

    Long Beach Steam Station - Plant 3 construction photos, superheater, header, boiler assembly, skylight over Turbo Room, flu opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.

    photCL SCE 13 - vol 094