Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Huntington Lake Dams - Dam #2 at Huntington Lake showing chutes, construction and concrete mixing plant. Job H-79#26
photCL SCE 02 - 04727

Visual Materials
Big Creek Huntington Lake Dams - Koppel Concrete Car [dump car holds 1 yard of concrete]
photCL SCE 02 - 04835
![Big Creek Huntington Lake Dams - Pouring concrete on Dam #3 at elevation 6910. [Locomotive pushing concrete batch cars onto dam] Job H](/_next/image?url=https%3A%2F%2Frail.huntington.org%2FIIIF3%2FImage%2F22APN4P40HR5%2Ffull%2F%5E360%2C%2F0%2Fdefault.jpg&w=750&q=75)
Visual Materials
Big Creek Huntington Lake Dams - Pouring concrete on Dam #3 at elevation 6910. [Locomotive pushing concrete batch cars onto dam] Job H-79#29
photCL SCE 02 - 04729

Visual Materials
Big Creek, Florence Lake Dam - 3.5 yard Dump cars for Tunnel #6.
photCL SCE 02 - 12066

Visual Materials
Big Creek, Florence Lake Dam - View looking North showing erection of forms for construction above early spring work on Arches 13 & 14, excavation for Arch 15, tramway trestle, West mixing plant, and West chuting towers in background, interados forms being erected for Arch 13, and concrete placing for Buttress 12 in progress.
photCL SCE 02 - 12646

Visual Materials
View of narrow gauge gasoline powered locomotive with empty dump cars at the dam site. The primitive locomotive had an accelerator, a lever to change direction, and a hand brake. The engineer sat on a pine board.
photCL SCE 12 - 00069