Image not available
Visual Materials
Powerhouse No. 8, Part One. Photographs of Dam 6, Camp 34, Camp 38, overview of Powerhouse 8 and penstock, milling Powerhouse 8 draft tube, operator's cottage, forebay, sluicing tailrace, generator floor, switchboard, rocks washed into tailrace after penstock burst, Unit No. 2 at Pelton Water Wheel Co., generator and governor at Powerhouse 8, penstock vent, transformers and bus, station power sets, switchboard, broken penstock, drilling tunnel No. 8, repaired penstock, steel forebay, Camp 32 cook house, Johnson Valve, Camp 33.
photCL SCE

Visual Materials
Big Creek - Powerhouse #8 (part 2) [Powerhouse #8 - Diversion, excavation for powerhouse, diversion tunnel construction, interior shots of PH #8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.]
photCL SCE 13 - vol 035
Image not available
Visual Materials
Powerhouse No. 8, Part Two. Photographs of Powerhouse 8 diversion, excavation for powerhouse, diversion tunnel construction, interior shots of Powerhouse No. 8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.
photCL SCE

Visual Materials
Big Creek - Powerhouse #2 & 2a (part 2) [Powerhouse 2 & 2A - auto transformers, substation, new 6.6kV line, new bridge for powerhouse extension, Unit #4 with direct connected exciter, constructing new Unit #4, 150kV - 220kV Bushings, switchboard, installation of new Unit #4 penstock, concrete plant, incline batch cars, stand pipes, Unit #3 foundation, Unit #3 penstock install, valve house modification, rock crushing plant, Johnson Valve, assembly of new Unit #3, auto circuit breakers, 150kV Oil Switch, new hoist, auto-transformers, and 11kV equipment, new Bus Bar installation, Governor #4; Camp #7 - telephone exchange, cottage, machine shop, warehouse, mess hall construction, sawmill; Camp #5 - forebay construction, batch plant, steam shovel excavating.]
photCL SCE 13 - vol 030

Visual Materials
Big Creek Powerhouse #8 - Tailrace PH #8 after penstock failure.
photCL SCE 02 - 12085

Visual Materials
Big Creek Powerhouse #8 - generator building showing tailrace retaining wall.
photCL SCE 02 - 07306