Big Creek, Vermilion Dam - First of four pictures showing debris deposited along shoreline at upper end of lake, due to recent drawdown Mono Creek where it enters lake at present water elevation
You might also be interested in

Big Creek, Vermilion Dam - 4th in series pictures
Visual Materials
Big Creek, Vermilion Dam - 4th in series pictures - Typical belt of debris deposited below high water line for approx[imately] 1/2 mile along north shore of lake.
photCL SCE 02 - 44813

Big Creek, Vermilion Dam - 3rd of series pictures
Visual Materials
Big Creek, Vermilion Dam - 3rd of series pictures. - Center portion of main mass of debris deposited below high water line along shoreline at extreme upper end of lake.
photCL SCE 02 - 44812

Big Creek, Vermilion Dam - Spill due to pressurization of Ward Tunnel
Visual Materials
Big Creek, Vermilion Dam - Spill due to pressurization of Ward Tunnel - approx[imately] 2000 [cfs flow] to Huntington Lake Portal.
photCL SCE 02 - 44773

Big Creek, Vermilion Dam - 2nd of series pictures
Visual Materials
Big Creek, Vermilion Dam - 2nd of series pictures - Extreme upper end of Mono Creek Channel. Floating debris represents 99% of all debris still water borne on lake.
photCL SCE 02 - 44811

Big Creek, Huntington Lake Dams
Visual Materials
Big Creek, Huntington Lake Dams - "Rock Meadow" - Floor deposited debris from 1955-1956 floods - about 200 feet from streem bed in back ground. Estimated flow of Big Creek at this point: about 1 cfs.
photCL SCE 02 - 44841

Big Creek, Vermilion Dam
Visual Materials
Big Creek, Vermilion Dam - Considerable undercutting along north bank. Test spill of approx[imately] 600 sec. ft. [cubic feet per second]
photCL SCE 02 - 44645