Big Creek, Vermilion Dam - 4th in series pictures - Typical belt of debris deposited below high water line for approx[imately] 1/2 mile along north shore of lake.
photCL SCE 02 - 44813

Visual Materials
Big Creek, Vermilion Dam - 3rd of series pictures. - Center portion of main mass of debris deposited below high water line along shoreline at extreme upper end of lake.
photCL SCE 02 - 44812

Visual Materials
Big Creek, Vermilion Dam - Spill due to pressurization of Ward Tunnel - approx[imately] 2000 [cfs flow] to Huntington Lake Portal.
photCL SCE 02 - 44773

Visual Materials
Big Creek, Vermilion Dam - 2nd of series pictures - Extreme upper end of Mono Creek Channel. Floating debris represents 99% of all debris still water borne on lake.
photCL SCE 02 - 44811

Visual Materials
Big Creek, Huntington Lake Dams - "Rock Meadow" - Floor deposited debris from 1955-1956 floods - about 200 feet from streem bed in back ground. Estimated flow of Big Creek at this point: about 1 cfs.
photCL SCE 02 - 44841

Visual Materials
Big Creek, Vermilion Dam - Considerable undercutting along north bank. Test spill of approx[imately] 600 sec. ft. [cubic feet per second]
photCL SCE 02 - 44645