Visual Materials
Big Creek, Vermilion Dam
- Description
- Big Creek, Vermilion Dam - Damp area at west end after placement of muck blanket.
- Date
- 7/15/1956
- Call number
- photCL SCE 02 - 44780
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Vermilion Dam - Shallow drain potter used in draining damp area adjacent to toe of dam at west end. 18" blanket of tunnel muck over drains.
photCL SCE 02 - 44777

Visual Materials
Big Creek, Vermilion Dam - Chevron drains in the process of placement in damp area at west end of dam.
photCL SCE 02 - 44778

Visual Materials
Big Creek, Vermilion Dam - Placing tunnel muck over drain network in damp area.
photCL SCE 02 - 44779

Visual Materials
Big Creek, Vermilion Dam - Drainage system from west showing west end damp area.
photCL SCE 02 - 44727

Visual Materials
Big Creek, Vermilion Dam - West blanket area after overflow from Boggy Meadow.
photCL SCE 02 - 44372

Visual Materials
Big Creek, Vermilion Dam - Vermilion looking west. Dark material is core end blanket.
photCL SCE 02 - 42745