Visual Materials
Big Creek, Vermilion Dam - Damp area at west end after placement of muck blanket.
photCL SCE 02 - 44780

Visual Materials
Big Creek, Vermilion Dam - Shallow drain potter used in draining damp area adjacent to toe of dam at west end. 18" blanket of tunnel muck over drains.
photCL SCE 02 - 44777

Visual Materials
Big Creek, Vermilion Dam - Damp area along toe of dam and east of service spillway prior to installation of pipe drains.
photCL SCE 02 - 44781

Visual Materials
Big Creek, Vermilion Dam - Drainage system from west showing west end damp area.
photCL SCE 02 - 44727

Visual Materials
Big Creek, Vermilion Dam - Lateral drains at upper end of auxiliary toe drain.
photCL SCE 02 - 44720

Visual Materials
Big Creek, Vermilion Dam - Extent of damp area along toe of dam near east abutment.
photCL SCE 02 - 44641