Portal Powerhouse - Deepening tailrace channel near powerhouse before end of outage and start of diversion thru by-pass.
photCL SCE 02 - 43801

Visual Materials
Portal Powerhouse - Starting to fill Potter Creek temporary diversion channel after returning tunnel flow to permanent tailrace.
photCL SCE 02 - 43686

Visual Materials
Portal Powerhouse - Emergency ditch dug to control increased flow thru bank at lower left.
photCL SCE 02 - 43735

Visual Materials
Portal Powerhouse - Side Channel Diversion thru openings in 12' diameter pipe - approx. 1700 cfs flow in Ward Tunnel
photCL SCE 02 - 44563

Visual Materials
Portal Powerhouse - South bank of powerhouse excavation with considerable seepage from tunnel diversion.
photCL SCE 02 - 43528

Visual Materials
Portal Powerhouse - Channel & Powerhouse structure, 700 cfs. Water flowing thru unrestricted By-Pass.
photCL SCE 02 - 43893