Visual Materials
Redondo Beach Steam Station
You might also be interested in

Redondo Beach Steam Station
Visual Materials
Redondo Beach Steam Station - Handling 10' pipe for test.
photCL SCE 02 - 42671

Redondo Beach Steam Station - Plant #1
Visual Materials
Redondo Beach Steam Station - Plant #1 - Gantry for handling 10 foot diameter cooling water pipes.
photCL SCE 02 - 27696

Redondo Beach Steam Station - Plant #1
Visual Materials
Redondo Beach Steam Station - Plant #1 - Gantry for handling 10 foot diameter cooling water pipes.
photCL SCE 02 - 27698

Redondo Beach Steam Station
Visual Materials
Redondo Beach Steam Station - Test of new pipe design for Redondo #2 at American Concrete Pipe & Construction Plant. Stone & Webster inspector.
photCL SCE 02 - 42669

Redondo Beach Steam Station
Visual Materials
Redondo Beach Steam Station - Test of pipe for Plant #2. Joint made up, deflected 1 foot while supported at end only, and taken apart without damage to spigot.
photCL SCE 02 - 42674

Redondo Beach Steam Station
Visual Materials
Redondo Beach Steam Station - Placing concrete for 120" test pipe.
photCL SCE 02 - 42670