Redondo Beach Steam Station
- Description
- Redondo Beach Steam Station - Handling 10' pipe for test.
- Date
- 7/8/1953
- Call number
- photCL SCE 02 - 42671
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Redondo Beach Steam Station - Test of pipe for Plant #2. Spall on bill due to accidental bumping of pipes in handling.
photCL SCE 02 - 42675

Visual Materials
Redondo Beach Steam Station - Placing concrete for 120" test pipe.
photCL SCE 02 - 42670

Visual Materials
Redondo Beach Steam Station - Test of new pipe design for Redondo #2 at American Concrete Pipe & Construction Plant. Stone & Webster inspector.
photCL SCE 02 - 42669

Visual Materials
Redondo Beach Steam Station - Plant #1 - Gantry for handling 10 foot diameter cooling water pipes.
photCL SCE 02 - 27696

Visual Materials
Redondo Beach Steam Station - Plant #1 - Gantry for handling 10 foot diameter cooling water pipes.
photCL SCE 02 - 27698

Visual Materials
Redondo Beach Steam Station - Test of pipe for Plant #2. Joint made up, deflected 1 foot while supported at end only, and taken apart without damage to spigot.
photCL SCE 02 - 42674