Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Big Creek Powerhouse #4



You might also be interested in

  • Big Creek Powerhouse #4

    Big Creek Powerhouse #4

    Visual Materials

    Big Creek Powerhouse #4 - Photo taken at site before any construction was started. Madera County side at dam site looking up river. Temporary water line for core drills just visible.

    photCL SCE 02 - 42594

  • Big Creek Powerhouse #4

    Big Creek Powerhouse #4

    Visual Materials

    Big Creek Powerhouse #4 - Photo taken at site before any construction was started. View downstream from area being considered for location of dam. Steepness of Fresno County (left) side can be seen.

    photCL SCE 02 - 42573

  • Big Creek Powerhouse #4

    Big Creek Powerhouse #4

    Visual Materials

    Big Creek Powerhouse #4 - Photo taken at site before any construction was started. View up river from above footbridge. Note steep side on channel on Fresno County side (right side of picture)

    photCL SCE 02 - 42572

  • Big Creek Powerhouse #4

    Big Creek Powerhouse #4

    Visual Materials

    Big Creek Powerhouse #4 - Photo taken at site before any construction was started. Erection of tower for footbridge, looking up river from Fresno County side. [The river would be on the right if you were looking up-stream from the Fresno County side, not on the left like this shot.]

    photCL SCE 02 - 42577

  • Big Creek Powerhouse #4

    Big Creek Powerhouse #4

    Visual Materials

    Big Creek Powerhouse #4 - Photo taken at site before any construction was started. Typical ground detail on Madera County side at dam site.

    photCL SCE 02 - 42576

  • Big Creek Powerhouse #4

    Big Creek Powerhouse #4

    Visual Materials

    Big Creek Powerhouse #4 - Photo taken at site before any construction was started. View of granite blocks on Madera side of dam site.

    photCL SCE 02 - 42579