Visual Materials
Big Creek Powerhouse #4
- Description
- Big Creek Powerhouse #4 - Photo taken at site before any construction was started. Typical ground detail on Madera County side at dam site.
- Date
- undated
- Call number
- photCL SCE 02 - 42576
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #4 - Photo taken at site before any construction was started. Detail of Madera County side just above footbridge.
photCL SCE 02 - 42604

Visual Materials
Big Creek Powerhouse #4 - Photo taken at site before any construction was started. Detail of Madera County side just above footbridge, showing more vertical detail than #36.
photCL SCE 02 - 42605

Visual Materials
Big Creek Powerhouse #4 - Photo taken at site before any construction was started. View of granite blocks on Madera side of dam site.
photCL SCE 02 - 42579

Visual Materials
Big Creek Powerhouse #4 - Photo taken at site before any construction was started. View of Madera County side of canyon at dam site showing large granite blocks
photCL SCE 02 - 42583

Visual Materials
Big Creek Powerhouse #4 - Photo taken at site before any construction was started. Madera County side at dam site looking up river. Temporary water line for core drills just visible.
photCL SCE 02 - 42594

Visual Materials
Big Creek Powerhouse #4 - Photo taken at site before any construction was started. View of Fresno County side of canyon from across the river, with access road shown. Note snow on ground (Fresno side gets very little sunshine, snow had all melted on Madera County side)
photCL SCE 02 - 42585