Visual Materials
Borel Powerhouse
- Description
- Borel Powerhouse - Isabella Main Dam - placing rip-rap along upstream face.
- Date
- 1/3/1953
- Call number
- photCL SCE 02 - 42109
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Borel Powerhouse - Isabella Auxiliary Dam showing placement of rock rip rap along upstream face on section east of Borel Conduit.
photCL SCE 02 - 40705

Visual Materials
Borel Powerhouse - Borel Canal - Loading rip-rap in Kernville
photCL SCE 02 - 42895

Visual Materials
Borel Powerhouse - Borel Canal - Rip-rap southeast of Refugio Flume.
photCL SCE 02 - 42886

Visual Materials
Borel Powerhouse - Borel Canal - Rip-rap at south end of Refugio Flume.
photCL SCE 02 - 42890

Visual Materials
Borel Powerhouse - Borel Canal - Rip-rap at north end of Refugio Flume.
photCL SCE 02 - 42891

Visual Materials
Borel Powerhouse - Borel Canal - Rip-rap and fill near 111+00, north of Refugio Flume.
photCL SCE 02 - 42892