Borel Powerhouse
- Description
- Borel Powerhouse - Isabella Auxiliary Dam showing placement of rock rip rap along upstream face on section east of Borel Conduit.
- Date
- 3/21/1952
- Call number
- photCL SCE 02 - 40705
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Borel Powerhouse - Isabella Main Dam - placing rip-rap along upstream face.
photCL SCE 02 - 42109

Visual Materials
Borel Powerhouse - Isabella Auxiliary Dam showing compacted fill in center section of dam. Portal tower for Borel Conduit Gates being constructed simultaneously with placement of fill.
photCL SCE 02 - 40729

Visual Materials
Borel Powerhouse - Auxiliary Dam showing outlet section of closed conduit through Isabella Auxiliary Dam.
photCL SCE 02 - 40723

Visual Materials
Borel Powerhouse - View of upstream end of closed section of Borel conduit through Auxiliary Dam.
photCL SCE 02 - 40717

Visual Materials
Borel Powerhouse - Auxiliary Dam showing closed Borel Conduit downstream from gate control tower prior to placement of fill over top.
photCL SCE 02 - 40722

Visual Materials
Borel Powerhouse - Borel Canal - Rip-rap southeast of Refugio Flume.
photCL SCE 02 - 42886