Visual Materials
Big Creek, Vermilion Dam
- Description
- Big Creek, Vermilion Dam - Section of perforated drain with lateral connection to relief hole R-16a.
- Date
- 10/10/1956
- Call number
- photCL SCE 02 - 44850
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Vermilion Dam - Installing 12" perforated drain [French drain] thru damp area near relief hole R-24. Note sand and gravel aroun pipe.
photCL SCE 02 - 43702

Visual Materials
Big Creek, Vermilion Dam - Exposed auxiliary toe drain perforated pipe - New installed lateral drill.
photCL SCE 02 - 44695

Visual Materials
Big Creek, Vermilion Dam - Auxiliary Drain #2. - Drain pipe completely installed. Cobble and gravel filter around perforated section.
photCL SCE 02 - 44580

Visual Materials
Big Creek, Vermilion Dam - Aux[iliary] Drain #2. Exposed upper end of perforated drain.
photCL SCE 02 - 44573

Visual Materials
Big Creek, Vermilion Dam - Installed lateral at auxiliary toe drain.
photCL SCE 02 - 44701

Visual Materials
Big Creek, Vermilion Dam - Lateral drain looking from R-24 west.
photCL SCE 02 - 44707