Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #3 - Progress picture taken from house 13 looking toward site of houses 7 to 12 inclusive. [Sewer and water line tunnel excavated in road in front of these houses. Water and sewer pipe strung out along trench, ready for installation.]
photCL SCE 02 - 41615

Visual Materials
Big Creek Powerhouse #3 - Progress picture looking east from house 16, showing excavated bench for houses 17 to 24 inclusive. [Sewer and water line trench excavated in road in front of these houses.]
photCL SCE 02 - 41616

Visual Materials
Big Creek Powerhouse #3 - Graded site for 40,000 gallon steel water tank on foreground. Trench excavation in progress for 6" water supply line to tank in background.
photCL SCE 02 - 41617

Visual Materials
Borel Powerhouse - Borel - Progress picture from downstream end of trench excavation for twin concrete conduits through the Isabella Auxiliary Dam. Forms for base of concrete gate structure being built in background.
photCL SCE 02 - 40213

Visual Materials
Big Creek, Florence Lake Dam - View looking North showing erection of forms for construction above early spring work on Arches 13 & 14, excavation for Arch 15, tramway trestle, West mixing plant, and West chuting towers in background, interados forms being erected for Arch 13, and concrete placing for Buttress 12 in progress.
photCL SCE 02 - 12646

Visual Materials
Big Creek Powerhouse #8 - Looking down on Powerhouse 8, showing conditions at end of construction road, storage space being provided, et. The road along the left center of the picture, and upon which two men are standing, is the section which will be used for reaching the generator floor of the 2nd unit. The concrete mixing plant, rock and sand bins, are just beginning to take form in the center of the picture by the derrick.
photCL SCE 02 - 15901